Calendar - Event View
This is the "Event Detail" view, showing all available information for this event.
If the event has passed, click the "Event Report" icon to read a report and view photos that were uploaded.
Shaw's Bridge Group B- Hockessin ~39 Miles ~1,800' Climbing
If you are a member, please log in to access additional, potentially lower registration fee options.
Ride Leader(s)
Kim D Slocum
Registration Info
Registration is required
Capacity
11 Total Slots
2 Available Slot(s)
About this event
Shaw's Bridge Group B-, Hockessin ~39 miles & ~1,800 feet of climbing.
Haven't been out this way in a while. Good conditions expected--time to tackle a little more challenging route. Same "social" pace as usual. NOTE-We will use the usual detour around the Walnut St. construction in Kennett Square.
TARGET PACE: 13.0-13.7mph
BREAK: Wawa (Hockessin)
DEPARTURE: Shaw's Bridge Park 9:00 AM
If the weather necessitates a cancellation, it will be posted by 7:30 AM on 5/16/23
Invalid Quantity